Kotor

  • Site name: Aqua/Amusement Park
  • Area: approximately 3 ha
  • Land ownership: 100% municipal
  • Planning documents: Local site study Grbalj I and Plan for setting up temporary prefabricated facilities
  • Terrain features: Flat
  • Utilities: No
  • Power supply: Yes
  • Telecommunications: Yes
  • The site is along the main road Kotor – Budva and is a former municipal waste landfill that was closed in 1990. Along the site flows a creek and it is approximately 5 km away from the beach Jaz.
  • Site name: mixed-use residential and commercial building Plagenti
  • Tyoe: Greenfield
  • Area: approximately 0.12 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan „Skladišna zona“
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The site is situated on the municipal lot ML 1606 and is a part of the cadastral lot 1989 that has 12 ancillary, ground-floor-only facilities – garages, intended for removal. It is 150 meters away from the sea and has a large parking area in the vicinity and there is a sports and recreation stadium nearby. Town centre is 1km away. The construction of a mixed-use residential and commercial building with the GEC (Ground Exploitation Coefficient) of 2.5, the TEC (Total Exploitation Coefficient) of 0.4, and a maximum number of storeys ground floor +4 is envisaged for this site.
  • Site name: Mixed-use residential and commercial facility Senta
  • Area: 0.073 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan of Dobrota
  • Terrain features: Flat
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The site is situated on the municipal lot ML 1671 and represents a part of the cadastral lot 2210/1 KO Dobrota I, it is in the immediate vicinity of the coastal road and the Faculty of Maritime Studies. The distance from the sea is 100 meters and it has a large parking space in the immediate vicinity, and the city centre is 400 meters away. The construction of a mixed-use residential and commercial building with GEC of 1.2, TEC of 0.4, and a maximum number of storeys ground floor+2 is envisaged for this site. The maximum gross floor area (GFA) of ​​the planned building is 900 m2.
  • Championship golf course with accompanying hotel facilities
  • Area: approximately 292 ha
  • Land ownership: 100% private
  • Planning documents: A detailed plan for golf and tourism complex Glavatičići
  • Note: To be elaborated in the spatial urban plan for the municipality of Kotor
  • Utilities: No
  • Power supply: Yes
  • Telecommunications: Yes
  • In accordance with Montenegro’s Golf Development Strategy, out of 10 planned locations, this one, as the best of all proposed sites in Montenegro, has the “detailed plan for the construction of a golf course and tourist complex Glavatičići” already provided in the strategy paper. A detailed elaboration envisages construction of one championship and 2 18-hole courses with accompanying high category hotel capacities noting that that development is the best example of planning a golf course and facilities on the Adriatic. For an area of ​​292 ha, which is mostly privately owned, the following are planned: a golf course on 171 ha, a golf resort on approximately 30ha, residential buildings on approximately 32 ha, roads, footpaths and bicycle lanes on 50 ha. The total GFA of ​​all facilities is about 100 ha, while with planned GEC of 0.08 and the TEC of 0.30.
  • 5 star hotel complex and 150 berth marina in Škaljari
  • Area: approximately 1.62 ha lot + 4.21 ha maritime zone
  • Land ownership: 100% state
  • Planning documents: Detailed site study (DSS) Sector 16
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The location is found in the most attractive part of the Municipality of Kotor, near the FC “Bokelj” stadium, indoor swimming pool “Nikša Bućin” and Kotor General Hospital. It is only 800 meters from the historic urban core of Kotor. The construction of high-end tourist facilities (3 5-star Boutique Hotels) with GFA of ​​approximately 16,000 m2, a 150-berth marina, the corporate building with GFA of ​​approximately 2,700 m2, a refuelling station and ancillary facilities in accordance with the operator’s standard. The number of storeys envisaged for the hotels is ground floor+1 or 2 +loft. The marina is planned as a VIP marina with 150 berths with 42,143 m2 of the surface allocated for the installation/construction.
  • 5 star hotel complex and 150 berth marina in Bigova
  • Area: approximately 3.84 ha
  • Land ownership: 100% state
  • Planning documents: Detailed site study Sector 38 and local site study “Trašte”
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • This is the site of the former military resort, where there are dilapidated buildings – a restaurant, an administrative building with 40 bungalows, where the construction of high-end tourist facilities (5-star hotel with annexes) with approximate capacity of 184 beds covering the area of 16,620 m2, with a 150-berth marina on approximately 4.4 ha of the sea surface area and the accompanying amenities in accordance with the operator standards (wellness and spa, coffee bar and restaurants), is envisaged. The hotel storey plan is envisaged as basement + ground floor+4, and the annex as basement + ground floor +1. The marina is envisaged to include 3 urban lots UPB04, UPB05 and UPB08, of which UPB04 represents a part of mainland on which the construction of administrative spaces for the marina with adequate catering facilities of 1,500 m2 GFA is envisaged, while UPB05 and UPB08 are envisaged for the construction of 150 berths.
  • 5-star resort with ancillary sports facilities in Bigova
  • Area: approximately 7.26 ha
  • Land ownership: 100% state
  • Planning documents: Detailed urban plan “Bigovo”
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • Detailed urban plan “Bigovo” envisages the construction of a 5-star covered by the aforementioned plan through blocks 3 and 5, where in block 3 in the UP133 the construction of a 150 bed hotel, aprox. 2.8ha in area, with ​​approx. 20,000 m2 GFA and the basement + ground floor + 2 + loft, is planned. In block 5 on the UP1, of an area of ​​approx. 44,000 m2, the construction of basketball, volleyball, soccer, tennis playgrounds and jogging trails and associated buildings with a maximum GFA of ​​1,400 m2 and a maximum permissible number of storeys ground floor + 1, is planned. In the same block the construction of parking spaces for 340 vehicles that would satisfy the needs of both the resort and sports facilities is envisaged. The detailed urban plan allows for a phased development.
  • A resort with annexes in Krimovica
  • Area: approximately 2.26 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed plan “Platamuni Trsteno”
  • Utilities: No
  • Power supply: No
  • Telecommunications: No
  • Mixed use residential and commercial development “Kamp”
  • Area: approximately 0.12 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan Dobrota
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The site is connected to the so-called third road in Dobrota, in the “Kamp” settlement, at a distance of 2.5 km from the town of Kotor, 200 meters from the sea. In the immediate vicinity of the aforementioned site is the main road Kotor – Herceg Novi, a hotel complex under construction, as well as the coastal road in Dobrota. These two cadastral lots make the urban lot S-2-14 and at the specified site, the mixed-use residential and commercial development of GEC of 2, TEC of 0.3 to 0.5 (depending on the number of floors) and the maximum permissible height of basement + ground floor to basement + ground floor + 2 + loft, is envisaged.
  • Mixed-use Residential and commercial development “Sveti Stasije”
  • Area: approximately 0.22 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan Dobrota
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The site exits onto the main road Kotor-Herceg Novi in the Sveti Stasije settlement, at a 5.5 km distance from the town of Kotor, 200m away from the sea. In the immediate vicinity of the site is the main road Kotor – Herceg Novi, St. Eustace church, and the coastal road in Dobrota. On the site, the construction of a mixed-use residential and commercial building with GEC of 1, TEC of 0.3 and maximum permissible height of basement + ground floor +2, is envisaged.
  • Tourist and commercial development “Dinara”
  • Area: approximately 0.64 ha
  • Land ownership: 100% municipal
  • Planning documents: General urban plan “Škaljari”
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The tourist and commercial development is envisaged at the site currently occupied by old facilities – offices and old factory halls, designated for removal, according to the design to be chosen in the public competition which is to meet the following requirements: GEC up to 35%, TEC up to 1.4 and maximum permissible height of a ground floor +3. The site is situated in an attractive location, 800 meters from the town centre, at only 15m away from the sea, in the immediate vicinity of the General Hospital, the police, FC “Bokelj” stadium, and the “Nikša Bućin“ indoor pool. It is directly connected to the coastal road Old Town – Prčanj in the seafront area. It is possible to design accommodation capacities for tourism purposes, annexes, apartments, a hotel, as well as a commercial facility, offices and the like.
  • Reconstruction of the existing facilities / construction of hospitality and tourism complex Stoliv
  • Area: approximately 0.14 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan “Stoliv”
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The location is along the coastal road and has a direct view of the sea. In the immediate vicinity is a post office and a walking path to Gornji Stoliv. On lots 253 and 254 are facilities that can be kept as such while any newly constructed facility must fit within given parameters of the plan, which are: GEC of 35%, TEC of 0;8 with maximum height of a ground floor +1+ loft.
  • Reconstruction of the “Sveti Križ” fortress
  • Area: approximately 0.3 ha
  • Land ownership: 100% municipal
  • Planning documents: Urban project of Perast
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • “Sveti Križ” fortress represents a dilapidated building of the old fortress which was built in 1570. It consists of an older fortress, a small castle and a lower part. The upper part consists of four levels and at the top there is a promenade. The fortress was constructed in the traditional technique and built in stone of high quality and overall general construction is sound, on solid ground and with almost no damage, except for the lower part which was undermined by the construction of the highway. The fortress has been envisaged for reconstruction and the urban project for the town of Perast defines its main role – cultural and information centre. Horizontal dimensions of the building are 924 m2 and the number of floors is ground floor+3 with the permitted maximum GFA of ​​1,716 m2.
  • Completion of the House of Culture in Risan with ancillary facilities
  • Area: approximately 0.3 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan Risan
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • This unfinished building was developed according to the design made after the disastrous earthquake that hit Kotor in 1979 and was supposed to represent the theatre, with the necessary facilities, cafes, offices and a restaurant. Only the rough construction works were finished before the construction stopped due to the lack of money. The municipality has detailed designs of the building which we can provide in an electronic form, upon request. The Municipality hopes to put the said building to its intended use and give Risan, which used to be the centre of Boka Bay, a deserved representative culture facility. The site is covered by the detailed urban plan “Risan” and represents municipal lot UP153.
  • Reconstruction of the Austrian-Hungarian prison, repurposing it into a hotel
  • Area: approximately 0.047 ha
  • Land ownership: 100% state
  • Planning documents: Urban project of the Old Town Kotor
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The prison is a listed building placed under protection and entered in the register of cultural properties in 1985. It was functional until 1986, after which it has been out of use and since 2010, during the tourist season, it has been used for cultural and scientific events. The issued urban and technical requirements and conservation requirements envisage the reconstruction of the facility retaining all the partition walls, since they are load-bearing. The intended future purpose is a high-end hotel with 55 rooms and a front desk, 88 seat restaurant, and other ancillary facilities on the ground floor. The reconstruction and repurposing design is currently being made, which will detail the costs of its repurposing.
  • Construction of a sports and commercial facility in Škaljari
  • Area: approximately 0.34 ha
  • Land ownership: 100% state
  • Planning documents: Detailed urban plan Škaljari
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • Indoor pool “Nikša Bućin“, situated on lot UP237, was built in 1984. Next to it, towards the road on the remaining lot space, the urban plan “Škaljari” envisages the construction of a sports and commercial facility as an independent entity, and can serve as a hotel with 30 rooms for athletes and tourists, given that it is situated in the immediate vicinity of the swimming pool, the football stadium and the hospital. The intended facility would have a gross area of 2,300.00 m2, a ground floor +2 storeys, with the possibility of providing accommodation (30 beds) and office space, cafes, shooting galleries, shops and other services, and the adjacent parking area with 26 lots.
  • Rekonstrukcion of the Mazarović palace in Perast
  • Area: approximately 0.095 ha
  • Land ownership: 100% state
  • Planning documents: Urban project of Perast
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • Mazarović palace is a dilapidated building representing the old palace which was built in the Baroque style. The palace is intended for reconstruction, with the urban project of Perast defining its purpose to be to offer government, business and commercial services, government institutions of economy, administration and culture, and as such it can house administration, culture, social services and business offices, craft and retail shops, as well as offer accommodation facilities.
  • Reconstruction of the Visković palace in Perast
  • Area: approximately 0.076 ha
  • Land ownership: 100% state
  • Planning documents: Urban project of Perast
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • Visković palace is a dilapidated building representing the old palace which was built in the Baroque style. The palace is intended for reconstruction, with the urban project of Perast defining its purpose to be to offer government, business and commercial services, government institutions of economy, administration and culture, and as such it can house administration, culture, social services and business offices, craft and retail shops, as well as offer accommodation facilities. The reconstruction design is currently being made, which will define its most suitable purpose and detail the costs of the intervention.
  • Reconstruction and repurposing of a residential building
  • Area: approximately 0.033 ha
  • Land ownership: 100% municipal
  • Planning documents: Detailed urban plan “Prčanj”
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • This lot is occupied by a residential building – the Old School, with a net area of 822 m2, of mixed-use as envisaged the detailed urban plan “Prčanj”, meaning that it may be repurposed for commercial, residential, hotel, office and other purposes.
  • Industrial zone – to be put to its intended use
  • Area: approximately 20 ha
  • Land ownership: 100% municipal
  • Planning documents: /
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • In 1980s, the municipality of Kotor has relocated all industrial facilities from the inner bay area to the area designated and built for the needs of housing industrial capacities. The bearings factory “Kotor”, the chemical products factory “Rivijera”, the rubber goods factory “Bokeljka” and a part of “Jugopetrol” have been relocated to the industrial zone. Nowadays, the said area still contains the same facilities, now privatised, and mostly converted into warehouses and business spaces intended for renting, with the only exception being “Daido metal”, a factory where the majority owners are Japanese, which is still operational, hires local workforce and exports finished products. The industrial zone has its own internal ring road, as well as complete infrastructure and the road width sufficient to meet all communication needs of major towing vehicles and trailers. The zone accommodates a few mega-markets specializing in the sale of building materials, furniture and retail trade. In the immediate vicinity, not more than a few hundred of meters away, there are 3 renowned petrol / gas stations, and restaurants. The greatest advantage is that this area has a direct access to the Herceg Novi – Tivat – Kotor – Budva road, the busiest road which has a direct link with the Republic of Croatia (60 km) and Bosnia and Herzegovina (75km). The nearby towns are in close proximity, Herceg Novi is 40km away, Tivat 5km, Budva 15km, Bar 50km, Nikšić 90km and Podgorica 85km away. Within this zone, all free / undeveloped lots, approx. 20 ha in area, are owned by the Municipality of Kotor. The Law on Spatial Planning and Construction of Structures has given the possibility to build facilities of common interest, regardless of the intended purpose of the plan, and given that manufacturing facilities employing at least 50 workers fall under such designation, production plants, factories etc. may be developed here.
  • Mixed-use commercial and residential zone Škaljari – to be put to its intended use
  • Area: approximately 1.26 ha
  • Land ownership: 100% municipal
  • Planning documents: /
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • The dilapidated buildings of the once “Livnica” factory, abandoned in the 1980s, occupy the above site. The urban project of the mixed-use commercial and residential zone Škaljari, now being adopted, envisages the construction of residential and commercial buildings in the urban plots 272b, 272c and 272d. The maximum GEC is 1.2, the maximum height is ground floor+3, while the maximum TEC is up to 35%.

Kotor

  • Area: 335 km2
  • Population: approximately 22,600
  • Climate: typical Mediterranean
  • Roads: M-2 highway connecting Kotor with other areas along the Adriatic highway; Lipci-Žabljak highway represents the connection between the Municipality of Kotor and the central region of Montenegro and mountain centres; regional road R-1 Trojica-Krstač and Trojica-Račevići connecting the Adriatic coast and the interior of Montenegro, regional road R-11 Risan-Grahovska plate represents the shortest connection with the highway Lepetani-Budva; regional road R-22 Kotor-Tivat intersection
  • Nearest airports are Tivat (8km), Dubrovnik (73km) and Podgorica (90km).
  • Sea port: Kotor there has an international seaport and a marina
  • Power Supply: substation 400/110 kV Podgorica 2 (transmission lines Podgorica 2 – Bar and Podgorica 2 – Budva. Podgorica 2 – Cetinje – Budva); substation 110/xkV Trebinje (transmission line 110kVTrebinje – Herceg Novi), transmission line 1l0kV Budva – Tivat – Herceg Novi – Trebinje; substation 110/35kV Mrčevac (two medium voltage 35kV and 10kV) – 2 transmission lines 35kV supplying Kotor (one for the substation 35/10 “Skaljari”, the other for the substation 35/10 “Morinj”); The entire area of ​​Kotor is supplied via transmission lines 35KV Tivat – Kotor, of ALČE95/15mm2in dimaeter and substations 35/10kV, 2x8MVA, located in Škaljari.
  • Each of the three distinct areas of the Municipality of Kotor has a variety of natural resources and cultural and historical heritage which favour the development of tourism.
  • The coast of Bay of Kotor offers all conditions for tourism development. This is a World Heritage site, rich in cultural monuments of different ages, crystal clear sea, beaches and good tourist infrastructure. It is suitable for high-end tourism, health tourism as a specific niche, nautical tourism and day-trips.
  • Mountainous hinterland complements the tourism prospects of Kotor offering hiking trails and different climate. It is suitable for day trips and recreational tourism.

The Government of Montenegro pays a lot of attention to direct foreign investment and for that purpose numerous laws and regulations have been adopted that protect the rights of foreign investors.

In this regard, it is necessary to mention the Law on Foreign Investments (from 2011) and the Decree on Incentives for Direct Investment (Official Gazette of Montenegro No. 80/15). Another relevant policy documents include Montenegro Development Directions 2015 – 2018, Montenegro Economic Reform Programme 2015 – 2017, and the Strategy for the Development of Manufacturing Industry in Montenegro 2014- 2018. Key institutions to support investments are the Foreign Investors Council, the Ministry of Economy and the Agency for Foreign Investments.

The 9% corporate profit tax is the lowest in the region.

The Agency for Foreign Investment and the Municipality of Kotor provide investors all the necessary “after care” services to facilitate their investments. The fast-track process of developing, or amending the planning documents, to mutual benefit of investors and the municipality of Kotor, is another facility made available to investors who own at least 10 ha of land.

 

  • Public utilities
No. Type Rate
1. Water supply and sanitation 2.77 €/m3
2. Solid waste collection and disposal /

 

  • Taxes
  1. Property tax
No. Type of facility Tax rate
1. Business premises 0.60
2. Production facilities (halls etc.) 0.30
3. Ancillary facilities 0.10

 

The tax base for the property tax calculation is the market value of the property according to the zone where it is located.

  1. Surtax to personal income tax

The rate of surtax to the personal income tax is defined by the Law on Local Self-Government Funding and amounts to 13% for the Municipality of Kotor.

  • Charges
  1. Charge for provision of utility infrastructure to construction land

The table below shows the charge rates depending on the zone (Extra – IV zones) for business premises:

Building zone E I II III IV
Charge rate (€/m2) 242 182 145 113 85

 

The average rate of the charge for provision of utility infrastructure is 153.4 €/m2.

 

  1. Charge for the use of municipal roads
No. TYPE OF CHARGE RATE
1. Annual charge for road land lease

–        Streets in towns and settlements

–        Local roads

–        Uncategorised roads

 

4.9 €/m2

3.9 €/m2

3.0 €/m2

2. Charge for connecting the access road to a municipal road one-off during the construction stage):

–        Streets in towns and settlements

 

–        Local roads

 

–        Uncategorised roads

 

 

 

490 € per connection

290 € per connection

150 € per connection

 

3. Charge for placing pipework, water pipes, sewage pipes, power, telephone and telegraph cables along a public road:

 

Urban street:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

Local roads:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

Uncategorized roads:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

 

 

 

 

 

5.9 €/m2

1.9 €/m2

990 €

 

2.9 €/m2

0.9 €/m2

790 €

 

 

2.0 €/m2

0.5 €/m2

400 €

4. Annual charge for placing and installing electronic, telephone and antennae devices and equipment:

–        one-off (upon instalment)

–        annual

 

 

 

2,900 €

950 €

5. Charge for the use of commercial facilities which have access from a municipal road (annual):

1.    For streets in towns and settlements, for:

–        petrol stations

–        hotels and motels up to 50 beds

–        hotels and motels over 50 beds

–        restaurants

–        other commercial facilities:

∙   area up to 50 m2

∙   area from 50 m2 to 100 m2

∙   area from 100 m2 to 150 m2

∙   area from 150 m2 to 200 m2

∙   over 200 m2

2.    For local and uncategorized roads, for:

–        petrol stations

–        hotels and motels up to 50 beds

–        hotels and motels over 50 beds

–        restaurants

–        other commercial facilities:

∙   area up to 50 m2

∙   area from 50 m2 to 100 m2

∙   area from 100 m2 to 150 m2

∙   area from 150 m2 to 200 m2

∙   over 200 m2

 

 

 

 

 

 

 

2,900 €

700 €

900 €

400 €

 

200 €

250 €

350 €

450 €

550 €

 

1,900 €

500 €

700 €

200 €

 

150 €

200 €

250 €

300 €

450 €

6. Charge for construction of commercial facilities:

–        Charge for the construction of commercial facilities up to 50 m2 which have access from a municipal or an uncategorized road, for:

∙   streets in settlements

∙   local roads

∙   uncategorized roads

–        Charge for the construction of commercial facilities from 50 m2 to 500 m2 which have access from a municipal road, for:

∙   streets in settlements

∙   local roads

∙   uncategorized roads

–        Charge for the construction of commercial facilities over 500 m2 which have access from a municipal road, for:

∙   streets in settlements

∙   local roads

∙   uncategorized roads

 

–       Petrol station

 

 

 

 

 

 

200 €

150 €

60 €

 

 

 

 

400 €

250 €

100 €

 

 

 

490 €

290 €

140 €

 

2,000 €

 

 

 

  1. Municipal fees
No. TYPE OF MUNICIPAL FEE RATE
1. Fees for asphalt and concrete bases, stone processing bases and sand production 37.68 €/month
2. Fees for wood cutting equipment:

–        bandsaw

–        gutter

–        circular saw

 

/

/

/

3. Fess for using billboards and panels

(depending on the size and type) (monthly)

10.41-135.33 €/side
4. Fee for the use of existing and placing new power supply facilities – transmission poles (monthly) /
5. Fee for the use of existing and placing new power supply facilities – distribution poles (monthly) /
6. Fee for the use of existing and placing new power supply facilities – substations  35/10 KV (monthly) /
7. Fee for the use of existing and placing new power supply facilities – substations (assembly concrete substation, concrete substation, brick-built substation, distribution substation) /
8. Fee for the use of existing and placing new power supply facilities – one pillar substations /
9. Fee for the use of existing and placing new power supply facilities  – low voltage cabinets (LV cabinets) /
10. Fee for the use of telecommunication facilities – mobile phone mast stations /
11. Fee for the use of telecommunication facilities – poles and manholes /
12. Fee for water plants and water machines (annually) 57.46 €/pc
13. Watercraft fee (annually) 50-161 €/watercraft
14. Commercial use of the shore (monthly) /

 

Mayor
dr Aleksandar Stjepčević Title Mayor
Tel 032/325-861
E-mail kabinet.predsjednik@opstinakotor.com
Mayor’s office
Branko Nedović Title Deputy Mayor
Tel 032/325-857
E-mail kabinet.potpredsjednik@opstinakotor.com
Tvrtko Crepulja Title Deputy Mayor
Tel 032/325-857
E-mail kabinet.potpredsjednik@opstinakotor.com
Jovo Suđić Title Deputy Mayor
Tel 032/325-857
E-mail kabinet.potpredsjednik@opstinakotor.com
Srđan Dragomanović Title Manager
Tel 032/325-857
E-mail menadzer@opstinakotor.com
Secretariat for Development of Entrepreneurship, Utilities and Transport
Zoran Stanković Title Secretary
Tel 032/325-865
E-mail privreda@opstinakotor.com
International Cooperation Office
Jelena Stjepčević Title /
Tel 032/325-859
E-mail jelena.stjepcevic@opstinakotor.com