PLAV

  • Type: Brownfield
  • Area: 3,964m2
  • Land ownership: State
  • Planning documents: Spatial-urban plan
  • Terrain features: Flat
  • Utilities: Yes
  • Power supply: Yes
  • Telecommunications: Yes
  • Note: There is a 1,533 m2 structure on site. The Titex plant in Murina was a part of the Titex factory from Podgorica.

PLAV

  • Area: 329 km2
  • Population: 9,310
  • Climate: submountain
  • Roads: M-9 highway, regional road R-9
  • Power supply: 77 10/0,4kV and two 35/10kV substations. Power supply to urban settlements is mostly done with the use underground lines, and to a lesser extent by aboveground lines
  • Farming land: approximately 450 ha
  • Forests: cca 22,843 ha
  • Hydropower resources: River Lim, and other watercourses represent significant hydropower resources of about 42.6 MW, (required installed capacity for small hydropower stations is up to 10 MW) which can be used for electricity generation. The following watercourses are envisaged for the research and construction of small hydro: Babinopoljske rivers, Komarače, Veličke rivers, Murinske rivers, Đuričke rivers and Grlje
  • According to the degree of complementarity, concentration and number of natural attractions that can be put to tourism use, the area of ​​this municipality is a unique mountain area in the region
  • Due to the specific climate, individual areas may be of interest as potential air spas for health tourism
  • Plavsko Lake is defined as the primary tourism zone at the municipal level
  • Babino Polje – Bogićevica, which is a typical high mountainous area that occupies a central position in the Montenegrin part of Prokletije is another primary tourism zone
  • Plav Municipality has yet to define the incentives and benefits for investors, but the planned adoption of the stimulus package will significantly improve the business environment in the municipality

 

  • Public Utilities
No. Type Rate
1. Water supply and sanitation /
2. Solid waste collection and disposal /

 

  • Taxes
  1. Property Tax
No. Type of facility Tax rate
1. Business premises 0.35
2. Production facilities (industrial halls etc.) 0.35
3. Ancillary facilities 0.10

 

The tax base for the property tax calculation is the market value of the property according to the zone where it is located.

  1. Surtax to personal income tax

The rate of surtax to the personal income tax is defined by the Law on Local Self-Government Funding and amounts to 13%for the Municipality of Plav.

  • Charges
  1. Charge for provision of utility infrastructure to construction land

The table below shows the charge rates depending on the zone (zones I-IV) for business premises:

Building zone I II III IV
Charge rate (€/m2) 16 10 7 6

 

The average rate of the charge for provision of utility infrastructure is 9.75 €/m2.

 

  1. Charge for the use of municipal roads
No. TYPE OF CHARGE RATE
1. Annual charge for road land lease

–        Streets in towns and settlements

–        Local roads

–        Uncategorised roads

 

4.9 €/m2

3.9 €/m2

3.0 €/m2

2. Charge for connecting the access road to a municipal road one-off during the construction stage):

–        Streets in towns and settlements

–        Local roads

–        Uncategorised roads

 

 

/

/

/

3. Charge for placing pipework, water pipes, sewage pipes, power, telephone and telegraph cables along a public road:

Urban street:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

Local roads:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

Uncategorized roads:

–        along the road alignment

–        outside the road alignment

–        crossing the road (per crossing)

 

 

 

 

5.9 €/m2

0.9 €/m2

900 €

 

2.9 €/m2

0.85 €/m2

500 €

 

2.0 €/m2

0.7 €/m2

200 €

4. Annual charge for placing and installing electronic, telephone and antennae devices and equipment:

–        one-off (upon instalment)

–        annual

 

 

 

2,500 €

900 €

5. Charge for the use of commercial facilities which have access from a municipal road (except gas stations) (annual):

–        hotels

–        restaurants

–        other facilities

450-600 €

250-400 €

250-400 €

6. Charges for placing signboards on and along roadways:

–        depending on the size and type of signboard, annual

 

 

20-100 €/m2

 

 

 

  • Municipal Fees
No. TYPE OF MUNICIPAL FEE RATE
1. Fees for asphalt and concrete bases, stone processing bases and sand production 50 €/month
2. Fees for wood cutting equipment:

–        band saw

–        gutter

–        circular saw

 

50 €/ month

40 €/ month

30 €/ month

3. Fess for using billboards and panels (depending on the size and type):

–        up to 1m2 (monthly)

–        over 1m2 (monthly)

 

 

10 €/m2

1000 €/m2

4. Fee for the use of existing and placing new power supply facilities – transmission poles (monthly) /
5. Fee for the use of existing and placing new power supply facilities – distribution poles (monthly) /
6. Fee for the use of existing and placing new power supply facilities – substations  35/10 KV (monthly) /
7. Fee for the use of existing and placing new power supply facilities – substations (assembly concrete substation, concrete substation, brick-built substation, distribution substation) /
8. Fee for the use of existing and placing new power supply facilities – one pillar substations /
9. Fee for the use of existing and placing new power supply facilities  – low voltage cabinets (LV cabinets) /
10. Fee for the use of telecommunication facilities – mobile phone mast stations /
11. Fee for the use of telecommunication facilities – poles and manholes /
12. Watercraft fee /
13. Commercial use of the shore 20 €/m2 month

 

Mayor
Šahmanović Orhan Title Mayor
Tel 051 251 420
E-mail opstinaplav@t-com.me
Secretariat of Economy, Development and Finance
Meliha Hadžialjević Title Secretary
Tel 051 251 129
E-mail sekretarijat.prf@gmail.com